RAKtherm PPRC PIPE JOINING METHODS

RAKtherm PPRC PIPE JOINING METHODS

The most important elements for the installation of plastic pipe manufacturers and consumers reliability , quality of materials used by a resource to the point of being healthy is also important. The Merge method used in pprc pipes, socket welding method is called. Supply socket method ; with the support of the welding machine, pprc pipe and fittings to each other is made through melting and bonding of the source method. Step-by-step;
– The pipe, the pipe in the direction perpendicular to the axis of the pipe with sharp shears will be private so only the cutting process is done properly.
– The welding machine at 260°C. It should be heated up. 
– Pipes and fittings welding machine by keeping ittirili toward each other from the translator. (Refer to the following resource table by looking at the source and the cooling period) 
– The Merge takes place immediately from the source machine to the pipe and fittings . During this process, without compromising the axis of the pipe and fittings must be combined. So, when you put the parts in contact they must be omitted. Precautions against errors which will be held during the application process should be taken very carefully. Otherwise it is likely that the loss of gaps between pipes and fittings and giving rise to a homogeneous structure. Now this give information about the measures that must be considered and taken; 
Pipe should be cutted with a pipe cutter and pipe segment in the direction perpendicular to the axis. 
– Foiled foil for pprc pipe welding should be peeled while. After becoming made to the source of particles should be peeling foil pipes are not sure. The source of pprc pipe and fittings should not be contaminated. 
– Source socket PPRC pipes 260 °C are carried out. The source of the source machine before the start of 260 °C. The heated, should be controlled. 
– You should be careful with the source of standby time. In the melting process, while it is definitely not pipe and fittings should be returned. 
– Parts bevel gear connections should not be used. 
– After the flooring installation has finished, the sealing test should be performed.

Call ; 0322-3540656 , 0333-3645773 , 0300-2856741
Email : arcorporations@gmail.com
Visit : www.arcorporation.pk

Leave a Reply